Progress against the field
From Mechelen 2026 to Paris GP 2026, the field gained 8:38 on Seher cetin.
Over the same races everyone got 1:56 slower, so 10:34 slower on the clock looks worse than it was.
How this is worked out ⓘ
A finish time moves for two reasons: the athlete, and the race — its course, its floor, its day. For each pair of races in a row in one category, we take everyone who raced both and use the middle of how much they moved (the median) as "the race". Whatever is left is the athlete. Doubles are compared only when the same two people raced both, and told as the pair's; relays are left out. A pair with fewer than 15 athletes in common is not shown.
Every race
3 races · 3 events
-
Paris GP23 Apr 2026Individual Open · Women2:04:22707/785Beat 10%
↑ 28 days after Mechelen 2026 8:38 worse than the field Why ↓Close ↑
8:38 behind the field: 10:34 slower on the clock, against 1:56 slower for everyone.
The fieldCompare these two →1:56 slower This athlete10:34 slower -
Mechelen26 Mar 2026Individual Open · Women1:53:48 PB258/300Beat 14%
-
Bordeaux20 Nov 2025Individual Open · Women2:15:07655/672Beat 3%