Progress against the field
From Bengaluru 2026 to Mumbai 2026, the field gained 3:48 on Parth Patel.
The clock says 1:17 faster, but the races themselves got 5:05 quicker for everyone.
How this is worked out ⓘ
A finish time moves for two reasons: the athlete, and the race — its course, its floor, its day. For each pair of races in a row in one category, we take everyone who raced both and use the middle of how much they moved (the median) as "the race". Whatever is left is the athlete. Doubles are compared only when the same two people raced both, and told as the pair's; relays are left out. A pair with fewer than 15 athletes in common is not shown.
Every race
3 races · 3 events
-
Mumbai17 Sep 2026Individual Open · Men1:51:30 PB352/927Beat 62%
↑ 159 days after Bengaluru 2026 3:48 worse than the field Faster on the clock, behind the field Why ↓Close ↑
1:17 faster on the clock, yet the race was 5:05 faster for everyone, so 3:48 was lost on the field.
The fieldCompare these two →5:05 faster This athlete1:17 faster -
Bengaluru11 Apr 2026Individual Open · Men1:52:47797/1806Beat 56%
-
Delhi19 Jul 2025Doubles Open · Men1:33:57 PB85/209Beat 59%