Progress against the field
From London Excel 2025 to Amsterdam 2026, the field gained 10:47 on Léo Tuffery.
Over the same races everyone got 1:05 slower, so 11:52 slower on the clock looks worse than it was.
How this is worked out ⓘ
A finish time moves for two reasons: the athlete, and the race — its course, its floor, its day. For each pair of races in a row in one category, we take everyone who raced both and use the middle of how much they moved (the median) as "the race". Whatever is left is the athlete. Doubles are compared only when the same two people raced both, and told as the pair's; relays are left out. A pair with fewer than 15 athletes in common is not shown.
Every race
4 races · 4 events
-
Toulouse19 Mar 2026Individual Pro · Men1:37:05281/325Beat 14%
-
Amsterdam21 Jan 2026Individual Pro · Men1:36:35221/243Beat 9%
↑ 48 days after London Excel 2025 10:47 worse than the field Why ↓Close ↑
10:47 behind the field: 11:52 slower on the clock, against 1:05 slower for everyone.
The fieldCompare these two →1:05 slower This athlete11:52 slower -
London Excel4 Dec 2025Individual Pro · Men1:24:43 PB349/467Beat 25%
-
Cologne10 Apr 2025Individual Open · Men1:33:39 PB838/1182Beat 29%