Progress against the field
Between Barcelona 2025 and Madrid 2025, Patrick Thorpe lost 4:28 to the field.
The clock says 3:09 slower, but the races themselves got 1:19 quicker for everyone.
How this is worked out ⓘ
A finish time moves for two reasons: the athlete, and the race — its course, its floor, its day. For each pair of races in a row in one category, we take everyone who raced both and use the middle of how much they moved (the median) as "the race". Whatever is left is the athlete. Doubles are compared only when the same two people raced both, and told as the pair's; relays are left out. A pair with fewer than 15 athletes in common is not shown.
Every race
6 races · 6 events
-
Glasgow11 Mar 2026Doubles Pro · Men1:19:32 PB61/66Beat 8%
-
Madrid27 Nov 2025Individual Open · Men1:23:30580/1312Beat 56%
↑ 216 days after Barcelona 2025 4:28 worse than the field Why ↓Close ↑
4:28 behind the field: 3:09 slower on the clock, against 1:19 faster for everyone.
The fieldCompare these two →1:19 faster This athlete3:09 slower -
Barcelona25 Apr 2025Individual Open · Men1:20:21 PB321/795Beat 60%
-
Birmingham25 Oct 2024Doubles Pro · Men1:24:24109/110Beat 1%
-
London26 Nov 2023Individual Pro · Men1:38:13 PB266/321Beat 17%
-
Manchester28 Jan 2023Individual Open · Men1:37:46436/649Beat 33%