Progress against the field
From Rimini 2025 to Turin 2026, the field gained 12:16 on Manuel Gibiino.
The clock says 10:32 slower, but the races themselves got 1:44 quicker for everyone.
How this is worked out ⓘ
A finish time moves for two reasons: the athlete, and the race — its course, its floor, its day. For each pair of races in a row in one category, we take everyone who raced both and use the middle of how much they moved (the median) as "the race". Whatever is left is the athlete. Doubles are compared only when the same two people raced both, and told as the pair's; relays are left out. A pair with fewer than 15 athletes in common is not shown.
Every race
3 races · 3 events
-
Turin30 Jan 2026Individual Pro · Men1:32:23221/268Beat 18%
↑ 245 days after Rimini 2025 12:16 worse than the field Why ↓Close ↑
10:32 slower on the clock in a race that was 1:44 faster for everyone: 12:16 lost to the field.
The fieldCompare these two →1:44 faster This athlete10:32 slower -
Rome26 Sep 2025Individual Open · Men1:17:23 PB176/632Beat 72%
-
Rimini30 May 2025Individual Pro · Men1:21:51 PB72/151Beat 52%