Progress against the field
Anton Fugger has dropped 6:59 behind the field from Verona 2025 to Vienna 2026.
The clock says 5:55 slower, but the races themselves got 1:04 quicker for everyone.
How this is worked out ⓘ
A finish time moves for two reasons: the athlete, and the race — its course, its floor, its day. For each pair of races in a row in one category, we take everyone who raced both and use the middle of how much they moved (the median) as "the race". Whatever is left is the athlete. Doubles are compared only when the same two people raced both, and told as the pair's; relays are left out. A pair with fewer than 15 athletes in common is not shown.
Every race
3 races · 2 events
-
Vienna6 Feb 2026Doubles Pro · Men1:03:14 PB70/355Beat 80%
-
Vienna6 Feb 2026Individual Open · Men1:16:04301/1311Beat 77%
↑ 63 days after Verona 2025 6:59 worse than the field Why ↓Close ↑
6:59 behind the field: 5:55 slower on the clock, against 1:04 faster for everyone.
The fieldCompare these two →1:04 faster This athlete5:55 slower -
Verona5 Dec 2025Individual Open · Men1:10:09 PB158/1523Beat 90%