Progress against the field
From London Excel 2025 to Rome 2026, the field gained 12:41 on Michaela Kalinova.
The clock says 12:07 slower, but the races themselves got 0:34 quicker for everyone.
The longest gap between two races compared here, 245 days between Manchester 2026 and Rome 2026, cost 9:18 on the field.
How this is worked out ⓘ
A finish time moves for two reasons: the athlete, and the race — its course, its floor, its day. For each pair of races in a row in one category, we take everyone who raced both and use the middle of how much they moved (the median) as "the race". Whatever is left is the athlete. Doubles are compared only when the same two people raced both, and told as the pair's; relays are left out. A pair with fewer than 15 athletes in common is not shown.
Every race
3 races · 3 events
-
Rome23 Sep 2026Individual Open · Women1:46:54192/239Beat 20%
↑ 245 days after Manchester 2026 9:18 worse than the field Why ↓Close ↑
8:18 slower on the clock in a race that was 1:00 faster for everyone: 9:18 lost to the field.
The fieldCompare these two →1:00 faster This athlete8:18 slower -
Manchester21 Jan 2026Individual Open · Women1:38:36505/825Beat 39%
↑ 48 days after London Excel 2025 3:23 worse than the field Why ↓Close ↑
3:23 behind the field: 3:49 slower on the clock, against 0:26 slower for everyone.
The fieldCompare these two →0:26 slower This athlete3:49 slower -
London Excel4 Dec 2025Individual Open · Women1:34:47 PB969/1542Beat 37%