Progress against the field
Between Birmingham 2024 and London Excel 2025, Arthur Doyle lost 12:08 to the field.
The clock says 4:27 slower, but the races themselves got 7:41 quicker for everyone.
The longest gap between two races compared here, 362 days between Birmingham 2024 and Birmingham 2025, cost 6:20 on the field.
How this is worked out ⓘ
A finish time moves for two reasons: the athlete, and the race — its course, its floor, its day. For each pair of races in a row in one category, we take everyone who raced both and use the middle of how much they moved (the median) as "the race". Whatever is left is the athlete. Doubles are compared only when the same two people raced both, and told as the pair's; relays are left out. A pair with fewer than 15 athletes in common is not shown.
Every race
3 races · 3 events
-
London Excel4 Dec 2025Individual Open · Men1:15:40773/2771Beat 72%
↑ 43 days after Birmingham 2025 5:48 worse than the field Why ↓Close ↑
2:46 slower on the clock in a race that was 3:02 faster for everyone: 5:48 lost to the field.
The fieldCompare these two →3:02 faster This athlete2:46 slower -
Birmingham22 Oct 2025Individual Open · Men1:12:54100/523Beat 81%
↑ 362 days after Birmingham 2024 6:20 worse than the field Why ↓Close ↑
1:41 slower on the clock in a race that was 4:39 faster for everyone: 6:20 lost to the field.
The fieldCompare these two →4:39 faster This athlete1:41 slower -
Birmingham25 Oct 2024Individual Open · Men1:11:13 PB102/816Beat 88%