Progress against the field
Ross Martin has dropped 10:21 behind the field from London Excel 2025 to Glasgow 2026.
The races themselves barely changed, so 10:41 slower on the clock is the real picture.
How this is worked out ⓘ
A finish time moves for two reasons: the athlete, and the race — its course, its floor, its day. For each pair of races in a row in one category, we take everyone who raced both and use the middle of how much they moved (the median) as "the race". Whatever is left is the athlete. Doubles are compared only when the same two people raced both, and told as the pair's; relays are left out. A pair with fewer than 15 athletes in common is not shown.
Every race
7 races · 7 events
-
Perth21 Aug 2026Doubles Pro · Men1:00:45 PB29/88Beat 67%
-
Brisbane9 Apr 2026Individual Pro · Men1:14:42 PB170/422Beat 60%
-
Glasgow11 Mar 2026Individual Open · Men1:21:55663/1452Beat 54%
↑ 97 days after London Excel 2025 10:21 worse than the field Why ↓Close ↑
10:21 behind the field: 10:41 slower on the clock, against 0:20 slower for everyone.
The fieldCompare these two →0:20 slower This athlete10:41 slower -
London Excel4 Dec 2025Individual Open · Men1:11:14 PB513/2779Beat 82%
-
Perth5 Sep 2025Doubles Pro · Men1:20:1868/91Beat 25%
-
Glasgow2 Mar 2024Relay · Mixed1:18:4723/42Beat 45%
-
MelbourneDate unknownIndividual Pro · Men1:17:05328/740Beat 56%