Progress against the field
From Poznan 2024 to London Excel 2025, the field gained 1:05 on Tom Reding.
The clock says 2:55 faster, but the races themselves got 4:00 quicker for everyone.
The longest gap between two races compared here, 238 days between Cologne 2025 and London Excel 2025, still ended 3:32 ahead of the field.
How this is worked out ⓘ
A finish time moves for two reasons: the athlete, and the race — its course, its floor, its day. For each pair of races in a row in one category, we take everyone who raced both and use the middle of how much they moved (the median) as "the race". Whatever is left is the athlete. Doubles are compared only when the same two people raced both, and told as the pair's; relays are left out. A pair with fewer than 15 athletes in common is not shown.
Every race
6 races · 6 events
-
Manchester21 Jan 2026Doubles Open · Men1:14:54201/404Beat 50%
-
London Excel4 Dec 2025Individual Open · Men1:22:05 PB1276/2771Beat 54%
↑ 238 days after Cologne 2025 3:32 better than the field Why ↓Close ↑
6:44 faster on the clock, and the race was 3:12 faster for everyone, so 3:32 of it was this athlete.
The fieldCompare these two →3:12 faster This athlete6:44 faster -
Cologne10 Apr 2025Individual Open · Men1:28:49690/1182Beat 42%
↑ 159 days after Poznan 2024 4:37 worse than the field Why ↓Close ↑
4:37 behind the field: 3:49 slower on the clock, against 0:48 faster for everyone.
The fieldCompare these two →0:48 faster This athlete3:49 slower -
London29 Nov 2024Doubles Open · Men1:13:44 PB516/984Beat 48%
-
Poznan2 Nov 2024Individual Open · Men1:25:00377/776Beat 51%
-
Bordeaux27 Apr 2024Individual Open · Men1:34:47571/809Beat 29%