Progress against the field
From Dublin 2024 to London Excel 2025, the field gained 6:13 on Rob Molloy.
The clock says 0:12 faster, but the races themselves got 6:25 quicker for everyone.
The longest gap between two races compared here, 315 days between Dublin 2024 and Rome 2025, cost 1:12 on the field.
How this is worked out ⓘ
A finish time moves for two reasons: the athlete, and the race — its course, its floor, its day. For each pair of races in a row in one category, we take everyone who raced both and use the middle of how much they moved (the median) as "the race". Whatever is left is the athlete. Doubles are compared only when the same two people raced both, and told as the pair's; relays are left out. A pair with fewer than 15 athletes in common is not shown.
Every race
3 races · 3 events
-
London Excel4 Dec 2025Individual Open · Men1:17:47937/2771Beat 66%
↑ 69 days after Rome 2025 5:01 worse than the field Why ↓Close ↑
5:01 behind the field: 2:04 slower on the clock, against 2:57 faster for everyone.
The fieldCompare these two →2:57 faster This athlete2:04 slower -
Rome26 Sep 2025Individual Open · Men1:15:43 PB418/1367Beat 69%
↑ 315 days after Dublin 2024 1:12 worse than the field Faster on the clock, behind the field Why ↓Close ↑
2:16 faster on the clock, yet the race was 3:28 faster for everyone, so 1:12 was lost on the field.
The fieldCompare these two →3:28 faster This athlete2:16 faster -
Dublin15 Nov 2024Individual Open · Men1:17:59144/545Beat 74%