Progress against the field
Richard Millar has dropped 1:26 behind the field from London Excel 2025 to Gdansk 2026.
The clock says 2:55 slower, but the races themselves got 1:29 slower for everyone.
How this is worked out ⓘ
A finish time moves for two reasons: the athlete, and the race — its course, its floor, its day. For each pair of races in a row in one category, we take everyone who raced both and use the middle of how much they moved (the median) as "the race". Whatever is left is the athlete. Doubles are compared only when the same two people raced both, and told as the pair's; relays are left out. A pair with fewer than 15 athletes in common is not shown.
Every race
5 races · 5 events
-
Gdansk10 Oct 2026Individual Open · Men1:16:54331/1349Beat 76%
↑ 310 days after London Excel 2025 1:26 worse than the field Why ↓Close ↑
2:55 slower on the clock in a race that was 1:29 slower for everyone: 1:26 lost to the field.
The fieldCompare these two →1:29 slower This athlete2:55 slower -
Manchester21 Jan 2026Doubles Open · Mixed1:20:51 PB457/824Beat 45%
-
London Excel4 Dec 2025Individual Open · Men1:13:59 PB717/2779Beat 74%
-
Birmingham22 Oct 2025Doubles Open · Men1:09:56 PB489/1177Beat 59%
-
Manchester24 Jan 2025Relay · Men1:04:2974/148Beat 50%